Skip to content
General renovation

From shell work to finishing, without a fragmented site.

One team holding demolition, technical works, scheduling and finishing together. That keeps the job faster, clearer and cleaner.

What's included

The building blocks of a full renovation.

We manage apartment, house and small commercial renovations across Brussels, Flemish Brabant and the rest of Belgium. You get one timeline, one point of contact and a fixed quote shaped around the real scope.

01

Demolition & preparation

Selective demolition, circulation protection and preparation for the new technical systems.

02

Trade coordination

Plumbing, electrical, ventilation and finishing aligned in one execution rhythm.

03

Dry build & plastering

Walls, ceilings, levelling and preparation before flooring and paint.

04

Final finishing

Installation, adjustments, handover checks and final cleanup ready for use.

Method

How we keep the site under control.

04 steps
  1. 01

    Site visit

    We measure up, discuss priorities and turn the scope into a clear quote.

  2. 02

    Phasing

    We lock the sequence so demolition, technical work and finishing do not block each other.

  3. 03

    Execution

    One point of contact tracks progress and flags every decision point.

  4. 04

    Handover

    We review the spaces with you and close out the final items properly.

Why it works

A renovation without loose ends.

Fewer handover mistakes

One team coordinating the trades means less time lost between separate contractors.

Realistic timing

The plan follows site logic rather than isolated promises from each trade.

Quality checked on site

Alignment, finishing and technical decisions are checked during the works, not after.

Fit for living or letting

We can phase works around owner occupation, rental turnaround or staged renovation.

Selection

Renovation work in view.

Finished kitchen after full renovation.
Kitchen after full renovationApartment
Finished living area after renovation.
Living area with finished detailingLiving
Renovated entrance hall.
Entrance hall and circulation zoneHall
FAQ

Renovation questions.

Do you also handle partial renovations?
Yes. We take on well-defined partial scopes as long as the technical package is coherent.
Can you renovate an occupied home?
Yes, with proper phasing. We organise zones to reduce dust, access issues and disruption.
Do you also upgrade the technical systems?
Yes. Electrical and plumbing upgrades are often included in the same renovation.
How quickly can works start?
That depends on the scope and the live schedule. After a site visit we can answer concretely.
Contact

Let’s talk about your project.

Phone0485 44 55 1224/7 emergenciesEmail[email protected]Quotes and questions
HoursMon–Sat · 07:00–19:00Emergency cover outside hours
LanguagesNL · FR · ENTrilingual dispatch

Planning a renovation project?

Free, no-obligation quote.

Request a quote