BATHROOM RENOVATION · TURNKEY
Your bathroom fully renewed in Belgium — from demolition to microcement, including sanitary and tiling. Fixed price before the work, 10-year guarantee.
What work does your bathroom need?
Start by defining the scope. What can stay and what needs replacing depends on the existing pipework, surfaces and the layout you want.
Complete bathroom renovation
From removal to fixtures and finishes: define what belongs in the quote.
Replace a bath with a shower
Discuss drainage, waterproofing and whether step-free access is feasible.
Plan a small bathroom
Measure the room, clearances and the position of plumbing connections.
Replace selected bathroom fixtures
Establish which fixtures and connections can remain in place.
Prepare your bathroom renovation and quote
Partial or complete renovation?
A new shower does not always require the same work as an entirely new bathroom. Discuss what you want to keep, what no longer works and which installations need checking. A different layout or ageing pipes may require a more extensive renovation.
From bath to shower: check the floor first
Have the drainage, available floor depth and waterproofing assessed before choosing a shower. A step-free shower is not feasible in every existing floor. Record the workable solution and required connections in the quote.
Small bathroom: measure before choosing
Note the dimensions, door swing, clearances and positions of water supplies and drains. Keeping existing connections may limit disruptive work, but must suit the proposed layout and the condition of the installation.
What can stay and what needs replacing?
List the bath, shower, toilet, basin and taps you want to keep or replace. Have the underlying surfaces and connections checked too: new fixtures alone will not resolve a damp or pipework problem.
What should you prepare for the first conversation?
Photos of the current bathroom, measurements, your preferred layout and a list of items to keep. Mention whether this is your only bathroom and whether access is via stairs or a lift. Discuss protection of the home and use of the room during the work.
What should the written quote include?
Ask for removal, waste disposal, pipework, waterproofing, ventilation, electrical work, fixtures and finishes to be listed separately. Agree who supplies materials, what checks are included and how unexpected work will be approved. Record the schedule and any temporary facilities too.
Read these guides before requesting a quote
What we do
Every bathroom renovation project is prepared, executed and inspected by our own team.
Demolition & prep
Strip-out of the old bathroom, removal, substrate preparation.
Waterproofing & systems
Waterproof membrane, plumbing, electrical to code.
Finishing
Tiling, microcement, sanitary, taps — delivered ready to use.
How it works
Four steps, no surprises. The price is fixed and signed before work begins.
Call or WhatsApp
Your request by phone, WhatsApp or form — we reply within 1 business day.
0485 44 55 12Visit & diagnosis
Free site visit, problem diagnosis and solution discussion.
Within 24–48 business hoursFixed quote
Fixed price, schedule and payment terms — confirmed in writing before start.
Price is locked hereExecution & inspection
Professional execution with photo report and final inspection together.
10-year liability on structural workOur recent projects
Indicative market prices — Belgium 2026
The ranges below are indicative market prices — not a price list or quote from Alpha Services.
Materials, scope of work, accessibility, distance and urgency (evening, night, weekend) may change the price. Ranges shown exclude VAT.
Detailed price guide: Bathroom renovation: price 2026 — complete cost overview by type
All of Belgium
Flanders, Wallonia and the Brussels-Capital Region. Fastest response in Vilvoorde, Zaventem and Brussels — 10 to 20 minutes.
Average response time: 10–75 min depending on distance.








What's in black and white
No empty promises: four commitments included in the quote you sign.
Fixed quote before the work
The price is fixed in writing. No extra charge without your prior agreement.
Weekly photo report
You receive progress photos every week. For emergencies: before and after photos.
Legal guarantees covered
10-year liability for structural work, 2 years on execution.
One point of contact
You have a single contact for planning, questions and follow-up.
Frequently asked questions
How much does a bathroom renovation cost?
€5,000–€25,000 depending on size and finish level.
How long does a bathroom renovation take?
On average 2–3 weeks for a standard bathroom.
Do you also do the electrical?
Yes, everything in-house: sanitary, electrical, tiling and finishing.
Are you insured?
Yes, fully insured with ten-year liability.
Is the quote free?
Yes, the quote is free and without obligation.
A bathroom renovation project in Belgium?
Free, no-obligation quote. Call or WhatsApp our team.
Mon–Sat · 07:00–19:00 · Emergency interventions 24/7