Waterproofing and drainage
A waterproof membrane under the tiles, a fall towards the floor gully, and connections tested before anything is closed up: that is what stops a badly finished shower from staining the ceiling of the flat below.
A shower that leaks, tiles lifting at the edge, a windowless room where mould keeps coming back: in Jette we take on the whole job — waterproofing, plumbing, electrics by safety zone, tiling, ventilation — with a fixed quote in writing before the first wall comes down. Plumber, electrician and tiler are on our own payroll, not subcontracted out.
Real site · Bathroom renovated start to finish
No contractor publishes their prices in Jette. We do. Pick your project and you get a realistic figure, without leaving your number.
Estimated budget — excl. VAT
· · · tear off and send us this estimate · · ·
Refine with 3 photosIndicative Belgian market ranges for 2026 — this is not our price list. Your exact price is confirmed in writing after the free site visit, and it doesn't change after that. The 6% rate applies to homes occupied for more than 10 years, used mainly as a private residence, with materials invoiced by the contractor.
One point of contact, one schedule, one invoice. We do not let waterproofing, tiling and electrics be handled by three crews that never talk to each other.
A waterproof membrane under the tiles, a fall towards the floor gully, and connections tested before anything is closed up: that is what stops a badly finished shower from staining the ceiling of the flat below.
A curbless walk-in shower needs a fall and a drain that fit within the depth of the floor. We check the existing screed at the survey, and tell you plainly if the slab means a small upstand rather than a perfectly flat floor.
A bathroom without mechanical extraction stays damp long after the shower is off, and mould returns on new tiling as readily as on old. We fit an extractor sized to the room, ducted to an existing outlet or a new one built for the job.
Sockets, lighting and electric heating follow the safety zones around the shower and the bath, set out in Belgium’s AREI/RGIE electrical code — not a standard socket fitted within splash range because it was easier.
Moving the soil stack changes where the shower or toilet can sit, but stays impossible when it serves several flats through a shared duct or runs through a load-bearing slab. We check this before drawing a layout that cannot actually be built.
Shower, bath, toilet, vanity unit and taps fitted and connected, finishing joints included. Cleaning the site is part of handover, not a line added on afterwards.
The price is fixed at step 3. After that, it does not move without your signature.
A call, or a few photos of the current bathroom over WhatsApp. We tell you straight away whether your project fits what we do — and if it does not, we say that too.
0485 44 55 12A site manager visits your home in Jette, checks for damp, the thickness of the screed, and where the existing drain sits — that is what tells us whether a curbless walk-in shower is possible without breaking into the slab.
Within 24–48 working hours · freeFirm price, day-by-day schedule, payment terms. This document is the contract: no extra is charged without your written approval first.
The price is fixed hereA photo update every week. At the end, we jointly check the waterproofing, the ventilation and the finishes, with handover photos and the certificates Belgian law requires.
10-year structural guaranteeThe first complaint levelled at contractors is the line item nobody saw coming. Here is what we rule out.
Our own projects, not stock photos. The full video follow-along is on our TikTok.






The ranges the market charges in 2026, published as they stand. Your quote may fall below or above them — it will be calculated, not estimated.
Indicative Belgian market ranges for 2026 — not an Alpha Services price list. Amounts excl. VAT. Fixed quote confirmed before work begins.
Nineteen municipalities, each running its own planning department — and plenty of co-ownership, where the managing agent has a say before the first hammer falls.
The 19 municipalities we cover
Most of Brussels' housing stock is co-owned: the managing agent (syndic) carries out decisions, but the general meeting makes them. Routine maintenance is voted by simple majority. Any change to the façade or shared areas needs a two-thirds majority; work touching the structure or ownership rights needs four-fifths. We prepare the technical file — quote, specification, sometimes a stability note — in the form your managing agent can put to a vote.
The rule is simple: a planning permit (permis d'urbanisme) is required, with a limited list of exceptions — interior work that doesn't affect stability, the layout of the housing units, or its designated use, like-for-like window replacement, an extension under 100 m² removed without rebuilding, solar panels not visible from the street. A listed building, or one on the heritage inventory — common in Brussels' older housing stock — is handled by the regional planning delegate instead of the municipality, with a 75-day decision period, or 160 days if a public inquiry is required. If refused, the applicant has 30 days to appeal to the regional government, then 60 days to the Council of State.
An EPB energy certificate is mandatory whenever a home is sold or let, and stays valid for ten years. For new-build, work treated as new-build, or a heavy renovation, a certified EPB adviser is mandatory: they prepare the EPB proposal, which forms part of the planning permit file. With an architect, the architect handles EPB follow-up directly; without one, Homegrade or your municipality's planning department can help.
As of 24.07.2026, no RENOLUTION grant application is being accepted for a final invoice dated 2025 or 2026, and the Region has not published any decision on reopening the scheme — check be.brussels before any quote. The ECORENO loan from the Housing Fund remains a concrete alternative in the meantime, at 2.5% to 3.5% interest, for insulation, ventilation, heating, solar panels or a heat pump. A renovation obligation is due to start on 1 July 2028 for all Brussels owners — none of it applies today, and we'll flag it when it does.
What comes up at almost every first visit.
Describe the job in three fields. We'll come back to you with a visit slot — free, no obligation, and without six follow-up calls.
WhatsApp opens with your message already written — all you need to do is press send. If nothing opens, call us on 0485 44 55 12.
Service area: Jette 1090, Région de Bruxelles-Capitale