VAT BE 0541.320.178 · REGISTERED OFFICE IN DILBEEK, 1701 · SINCE 2014
Alpha Services Benelux Alpha Services Benelux Hamont-Achel · Renovation 0485 44 55 12
Hamont-Achel · fixed quote before work starts ★ 4.8/5 · Trustindex

RENOVATION
IN HAMONT-ACHEL
TURNKEY

Trades are ordered so plastering follows the structural repair and joinery precedes the final decoration, preventing a finish from being laid before the work above it is complete.

FIXED PRICE zero hidden extras 10 YEARS liability cover VCA certified team VAT 6% home +10 years
Renovation — Hamont Achel — Alpha Services Benelux Real site · Full interior renovation
Workshop DilbeekHamont-Achel and the surrounding area
01 · Estimate

Your estimate
in 20 seconds

Most contractors don't publish their prices in Hamont-Achel. We do. Three choices, and you walk away with a realistic ballpark figure, without leaving your number behind.

Step 1 — What do you want to renovate?
Step 2 — Area to renovate
Step 3 — Level of finish
Preliminary quote HAM · RENO · 2026

Estimated budget — excl. VAT

Indicative build duration
VAT 21% — home under 10 years old
VAT 6% — home over 10 years old
Savings from the reduced rate
Total incl. VAT at 6%

· · · tear off and send us this estimate · · ·

Refine with 3 photos

Indicative Belgian market ranges for 2026 — this is not our price list. Your exact price is confirmed in writing after the free site visit, and it doesn't change after that. The 6% rate applies to homes occupied for more than 10 years, used mainly as a private residence, with materials invoiced by the contractor.

02 · Scope

From structural work
to the final finish

One point of contact, one schedule, one invoice. We do not stack a chain of subcontractors on top of your project.

Deciding the full sequence before any material arrives reorders every decision that follows. The visit records each condition, the quote lists every stage in the order it will be executed, and the signed document becomes the single reference for the crew on site. No stage begins until the preceding one is signed off, so the programme moves forward without rework.

01

Complete flat renovation

The classic scope: rewired electrics and new plumbing, flooring, partition walls, bathroom, kitchen, painting. Liaison with the building manager included.

02

House & period property

Renovation in phases or all at once: damp, windows, insulation, reworking the layout across floors, with a structural survey where the work calls for it.

03

Bathroom, start to finish

Demolition, waterproofing, tiling, sanitaryware, ventilation and electrics brought up to standard: one team, not four separate appointments.

04

Kitchen & knocking through

Fitted kitchens, removing a non-load-bearing wall, steel beam installation, floor openings: a structural survey first whenever the span calls for it.

05

Electrics & plumbing to code

Consumer unit upgrades, bringing wiring up to AREI/RGIE standard, heating and sanitaryware: our electricians and plumbers are on our own payroll.

06

Plans, permits & management

Architect's drawings, a planning application with your local council, and the paperwork your building manager asks for before work starts.

03 · Process

Four steps,
zero nasty surprises

The price is locked in at step 3. After that, it does not change without your signature.

1

You tell us about it

A call, or three photos over WhatsApp. We tell you straight away whether your project fits what we do — and if it does not, we say that too.

0485 44 55 12
2

Visit & assessment

A site manager comes to see you in Hamont-Achel, takes measurements, checks the existing structure (damp, electrics, load-bearing elements) and works out which trades are needed.

Within 24 – 48 working hours · free
3

Fixed quote, line by line

Firm price, schedule, payment terms. This document is the contract: no extra is invoiced without your prior written agreement.

The price is locked in here
4

Site works & handover

A photo update every week. At the end, we check the finish together, with completion photos and any certificates required by Belgian law.

10-year structural guarantee
04 · Commitment

What will never
appear on your invoice

The most common complaint about contractors is the line item nobody saw coming. Here is what we rule out from the start.

  • An extra charge decided without youAny work outside the quote is costed and approved in writing before it goes ahead. No agreement, no invoice.
  • A surprise call-out chargeIt is in the quote or it does not exist: travel is included in the price, wherever you are.
  • A quote that costs moneyThe visit and the quote are free, even if you do not sign.
  • VAT charged at 21 % by defaultIf your home is more than 10 years old, we apply the reduced 6 % rate and prepare the certificate.
  • A site left half-finishedThe schedule is part of the quote. You get a photo progress update every week.
05 · Projects

Photos of our
real projects

Our own projects, not stock photos. The full video follow-along is on our TikTok.

Renovation — Hamont Achel — Alpha Services Benelux
Full renovationOpen-plan kitchen, flat
Fully fitted bathroom with walk-in shower, tiling and sanitaryware installed
BathroomWalk-in shower
Bathroom finished in microcement, with no visible grout lines
High-end finishMicrocement
New flooring laid after renovation, screed and covering completed
Flooring & screedFinished flooring
Renovated entrance hall after painting and flooring work
InteriorEntrance hall
Renovated living space: walls, ceiling and floor redone
InteriorLiving space

Watch our projects on video ↗

06 · Prices

Indicative prices
on the Belgian market

The ranges the market charges in 2026, published as they stand. Your quote may fall below or above them — it will be calculated, not estimated.

Light renovation
300 € – 800 € / m²
Mid-range renovation
800 € – 1 500 € / m²
Major renovation
1 500 € – 2 500 € / m²
Full bathroom
8 000 € – 18 000 €
Fitted kitchen
12 000 € – 28 000 €
Load-bearing wall removal
1 500 € – 4 000 €
Main contractor coordination
10 – 15 % of budget

Indicative Belgian market ranges for 2026 — not an Alpha Services price list. Amounts excl. VAT. Fixed quote confirmed before work begins.

07 · Terrain

Renovating in Hamont-Achel:
what changes

Five provinces, one Flemish planning permit system (omgevingsvergunning) — but rules that have already shifted twice since early 2026.

When the homeowner requests a change, the alteration is written into a supplementary addendum that sets out the revised scope and the adjusted cost. Both parties sign the addendum before the amended work proceeds, keeping the programme transparent.

The 5 provinces we cover

Flemish Brabant Antwerp East Flanders West Flanders Limburg
07.1 · Planning permit (omgevingsvergunning)

Exempt since 1 March 2026 — not 'coming soon'

Since 1 March 2026, most interior work is exempt from Flanders' single environmental and building permit (omgevingsvergunning) and from any notification requirement, provided the building's volume doesn't change and its energy performance doesn't worsen. Some municipalities keep a local permit requirement, but only for a limited list set by the Flemish government. Where a permit is still needed, expect 60 days under the simplified procedure or 105 to 120 days under the standard one, with a possible 60-day extension.

07.2 · Renovation obligation

Already in force for three years — Brussels and Wallonia start only in 2028

Since 2023, anyone buying a home with an EPC label of E or F must renovate it to at least label D within a legal deadline — 5 to 6 years depending on the purchase date; check the exact cut-off on energiesparen.be. Missing the label risks a fine of €500 to €5,000, repeatable every year until the label is reached. This is already in force in Flanders, while Brussels and Wallonia won't introduce a comparable obligation until 2028.

07.3 · Mijn VerbouwPremie

Top two income brackets: heat pump or boiler, nothing else

Since 1 March 2026, the two highest income brackets can no longer claim Mijn VerbouwPremie for most works — only for a heat pump or a thermodynamic boiler, and at a reduced amount: an air-to-water heat pump down from €2,250 to €1,500, a thermodynamic boiler down from €900 to €450. Brackets 3 and 4 keep the previous amounts. Anyone who applied before 1 March 2026 stays under the old conditions.

07.4 · EPC-labelpremie

EPC-labelpremie: the window has closed

The EPC-labelpremie has been scrapped for every income bracket, and its transition window — applications until 30 June 2026 for an EPC started before the end of 2025 — is now closed. Only households that activated their EPC through Fluvius before 1 January 2025 remain exempt. Don't count on this grant in a quote drawn up today.

08 · Questions

Your questions
before you sign

What comes up at almost every first visit.

Can the quote increase once work has started?
Not without your written agreement. The quote is a firm price, broken down line by line. If something unexpected turns up — a dead pipe behind a wall, a weakened structure — we stop, cost it, show you, and you decide. No extra work goes ahead without your sign-off.
How quickly can you visit us in Hamont-Achel?
We generally arrange the assessment visit within 24 to 48 working hours. The actual start date for the work depends on our current schedule and is stated in the quote — we do not promise a date we cannot keep.
Can I stay at home during the works?
For a bathroom or kitchen, usually yes: we phase the work around you. For a full renovation with demolition and rewiring, it is rarely comfortable to stay. We tell you honestly at the visit, along with the schedule that goes with it.
Do I need planning permission for my renovation?
It depends on the type of work and your local council. Interior refresh, sanitaryware, electrics, flooring: usually not. Changes to the facade, the volume, a load-bearing structure, or a change of use: yes. We give you a clear answer at the visit and put together the file with the architect if needed.
What does the quote actually contain, and what is deliberately excluded?
The quote specifies each trade, the sequence of operations and the agreed total. Provisional items such as unforeseen structural findings are noted as exclusions, to be priced in a signed addendum if they arise.
How is the renovation divided into stages, and what must be finished before the next begins?
Demolition and structural stabilization finish first, followed by services rough-in, then lining and plastering, with joinery and decoration last. Each phase is inspected and approved before the following trade starts.
09 · Contact

A PROJECT
IN HAMONT-ACHEL?
LET'S TALK.

Describe the job in three fields. We'll come back to you with a visit slot — free, no obligation, and without six follow-up calls.

Request a visit

3 fields · 20 seconds

Prefer to call?
0485 44 55 12
Here we go

WhatsApp opens with your message already written — all you need to do is press send. If nothing opens, call us on 0485 44 55 12.

Also working near Hamont-Achel

Service area: Hamont-Achel 3930, Limburg

Our other services in Hamont-Achel