Strip-out & clearance
The old kitchen removed, the rest of the home protected, rubble and old appliances cleared before anything new is connected.
In Uccle, the route materials take from the street to the kitchen is checked before the quote is written, fixing the order trades follow afterwards.
Real site · Kitchen renovation
No contractor in Uccle publishes their prices. We do. Three choices, and you leave with a ballpark figure, without leaving your number.
Estimated budget — excl. VAT
· · · tear off and send us this estimate · · ·
Refine with 3 photosIndicative Belgian market ranges for 2026 — this is not our price list. Your exact price is confirmed in writing after the free site visit, and it doesn't change after that. The 6% rate applies to homes occupied for more than 10 years, used mainly as a private residence, with materials invoiced by the contractor.
One point of contact for plumbing, wiring, tiling and fitting the units. We do not run a chain of subcontractors above your project.
What a homeowner in Uccle is left holding once a kitchen renovation closes is the marked-up quote itself, alongside the documents recording every decision made along the way. Each addition agreed after the visit is noted against the original figure, not folded in silently, so the paperwork stays a readable record rather than a single final number. The trades are sequenced so that plumbing, electrics and finishing follow a fixed order agreed in advance. Nothing is opened without that order having been settled first.
The old kitchen removed, the rest of the home protected, rubble and old appliances cleared before anything new is connected.
Moving the water inlet or the drain to match your new layout: possible in most cases, unless the distance to the soil stack forces a rethink of the layout.
A separate line for the oven and hob, a consumer unit sized for it, wired to AREI/RGIE code: our electricians are on our payroll, not passing subcontractors.
Working out where the hood actually vents, through the wall or the roof depending on the layout, with ducting sized to actually clear the air, not just spin.
Taking down a non-load-bearing wall, or fitting a steel beam when the span needs it: a structural check before pricing, never after demolition.
Screed, tiling, paint, worktop cut for the sink and hob, units fitted: in that order, so the tiles are never laid twice.
The price is fixed at step 3. After that, it does not move without your signature.
A call, or photos over WhatsApp: current layout, position of the sink, the consumer unit and the hood. We tell you straight away if the project fits what we do, and if it does not, we tell you that too.
0485 44 55 12A site manager comes to Uccle, checks the water supply and drain, the power available at the consumer unit and where the hood can actually vent, before anything is priced.
Within 24 – 48 working hours · freeFirm price, schedule, payment terms. This document is the contract: no extra connection and no unforeseen plastering is billed without your written agreement.
The price is fixed hereA photo report every week. At the end, we check the finishes together, the sealing around the sink and hob, and the certificates Belgian law requires.
10-year structural guaranteeThe first complaint made about contractors is the line nobody saw coming. Here is what we rule out.
Our own projects, not stock photos. The full video follow-along is on our TikTok.






The ranges the market charges in 2026, published as they stand. Your quote may fall below or above them — it will be calculated, not estimated.
Indicative Belgian market ranges for 2026 — not an Alpha Services price list. Amounts excl. VAT. Fixed quote confirmed before work begins.
Nineteen municipalities, each running its own planning department — and plenty of co-ownership, where the managing agent has a say before the first hammer falls.
Any existing installation uncovered in a Uccle kitchen, a gas line, old wiring, a hidden stopcock, is logged in writing during the visit, with its location noted before anything is removed. That record joins the quote, so later work references what was found, not what was assumed.
The 19 municipalities we cover
Most of Brussels' housing stock is co-owned: the managing agent (syndic) carries out decisions, but the general meeting makes them. Routine maintenance is voted by simple majority. Any change to the façade or shared areas needs a two-thirds majority; work touching the structure or ownership rights needs four-fifths. We prepare the technical file — quote, specification, sometimes a stability note — in the form your managing agent can put to a vote.
The rule is simple: a planning permit (permis d'urbanisme) is required, with a limited list of exceptions — interior work that doesn't affect stability, the layout of the housing units, or its designated use, like-for-like window replacement, an extension under 100 m² removed without rebuilding, solar panels not visible from the street. A listed building, or one on the heritage inventory — common in Brussels' older housing stock — is handled by the regional planning delegate instead of the municipality, with a 75-day decision period, or 160 days if a public inquiry is required. If refused, the applicant has 30 days to appeal to the regional government, then 60 days to the Council of State.
An EPB energy certificate is mandatory whenever a home is sold or let, and stays valid for ten years. For new-build, work treated as new-build, or a heavy renovation, a certified EPB adviser is mandatory: they prepare the EPB proposal, which forms part of the planning permit file. With an architect, the architect handles EPB follow-up directly; without one, Homegrade or your municipality's planning department can help.
As of 24.07.2026, no RENOLUTION grant application is being accepted for a final invoice dated 2025 or 2026, and the Region has not published any decision on reopening the scheme — check be.brussels before any quote. The ECORENO loan from the Housing Fund remains a concrete alternative in the meantime, at 2.5% to 3.5% interest, for insulation, ventilation, heating, solar panels or a heat pump. A renovation obligation is due to start on 1 July 2028 for all Brussels owners — none of it applies today, and we'll flag it when it does.
What comes up at every first kitchen visit.
Describe the job in three fields. We'll come back to you with a visit slot — free, no obligation, and without six follow-up calls.
WhatsApp opens with your message already written — all you need to do is press send. If nothing opens, call us on 0485 44 55 12.
Service area: Uccle 1180, Région de Bruxelles-Capitale