VAT BE 0541.320.178 · REGISTERED OFFICE IN DILBEEK, 1701 · SINCE 2014
Alpha Services Benelux Alpha Services Benelux Uccle · Flooring 0485 44 55 12
Uccle · fixed quote before work starts ★ 4.8/5 · Trustindex

FLOORING
IN UCCLE
& TILING

When tiling or flooring work in Uccle turns up something the visit missed, it is written up, priced, and confirmed with you before the work goes on.

FIXED PRICE zero hidden extras 10 YEARS liability cover VCA certified team VAT 6% home +10 years
Large-format tiles laid in a living room in Uccle, grout lines and finishing completed by the Alpha Services team Real site · Flooring and tiling work
Workshop DilbeekUccle and surrounding area
01 · Estimate

Your estimate
in 20 seconds

No tiler in Uccle publishes prices. We do. One flooring type, one surface area, and you leave with a realistic estimate, without giving us your number.

Step 1 — Which flooring?
Step 2 — Surface area
Step 3 — Finish level
Preliminary quote UCC · FLOO · 2026

Estimated budget — excl. VAT

Indicative build duration
VAT 21% — home under 10 years old
VAT 6% — home over 10 years old
Savings from the reduced rate
Total incl. VAT at 6%

· · · tear off and send us this estimate · · ·

Refine with 3 photos

Indicative Belgian market ranges for 2026 — this is not our price list. Your exact price is confirmed in writing after the free site visit, and it doesn't change after that. The 6% rate applies to homes occupied for more than 10 years, used mainly as a private residence, with materials invoiced by the contractor.

02 · Scope

From bare screed
to finished floor

One tradesperson follows the subfloor from start to finish: screed, laying, grouting and finishing. No chain of subcontractors on your job.

The first disagreement between a Uccle house and its quote usually surfaces once flooring is lifted or old tiling comes away, showing a substrate, a damp patch or a run of pipework nobody could price from a walk-through. That finding is measured, described and costed on the spot, then set out as a written addendum for you to approve before the crew carries on. Nothing is added to the job without that step, and nothing already agreed is touched by it.

01

Tiling, floor and wall

The subfloor is checked before laying: flatness, residual moisture, and waterproofing fitted under tiles in wet areas such as showers and bathrooms. Grout choice matters too: untreated grout darkens with moisture and use, while epoxy or water-repellent grout resists staining for longer.

02

Parquet & laminate

Solid or engineered parquet acclimatises to the room before it is laid; laminate, with its HDF core, is less sensitive to this and is almost always floated and click-fitted. Either way, an expansion gap left at the edges lets the floor move. Skirting and thresholds go in last, to cover that gap.

03

Screed & levelling

Nothing gets laid on a subfloor that is not flat: we check it against a 2-metre straightedge before any covering goes down. Drying time depends on the thickness and type of screed, and it does not shorten because a fan is pointed at it.

04

Poured flooring, resin & microcement

A seamless finish, applied in thin coats with drying time between each one. Suited to living rooms, open-plan kitchens and bathrooms, on a subfloor that is completely flat and dry.

05

Flooring over underfloor heating

Tile copes well with underfloor heating provided enough expansion joints are built in. Parquet needs a gradual warm-up and wood suited to the system: not every parquet is.

06

Sound insulation and what the building manager requires

In a flat, the co-ownership rules often set an impact-noise limit for any hard floor above a neighbour. We fit the right acoustic underlay before laying, not after a complaint.

03 · Process

Four steps,
a checked subfloor

The price is fixed at step 3. After that, it does not change without your signature.

1

You describe the job

A call, or photos of the current floor over WhatsApp. We tell you straight away if your project fits what we do — and if it does not, we say that too.

0485 44 55 12
2

Site visit & subfloor check

A site manager visits you in Uccle, checks the flatness and moisture of the existing subfloor, and identifies what needs laying or removing.

Within 24-48 working hours · free
3

Fixed quote, item by item

Firm price, drying time built into the schedule, payment terms. This document is the contract: no extra is billed without your prior written agreement.

The price is fixed here
4

Site work & handover

A photo report every week. At the end, we check the grout, skirting and thresholds together, then hand over the certificates Belgian law requires.

10-year guarantee
04 · Commitment

What will never
appear on your invoice

The most common complaint is the line item nobody saw coming. Here is what we rule out.

  • An extra decided without youAny work outside the quote is priced and approved in writing before it starts. No agreement, no invoice.
  • A surprise call-out feeIt is in the quote or it does not exist: travel is included in the price, whatever your address.
  • A quote you pay forThe visit and the quote are free, even if you do not sign.
  • 21% VAT by defaultIf your home is over 10 years old, we apply the reduced 6% rate and prepare the certificate.
  • Flooring laid before the subfloor is dryWe do not lay anything until the screed has reached its residual moisture target. The schedule is built around drying time, not the other way round.
05 · Projects

Photos of our
real projects

Our own projects, not stock photos. The full video follow-along is on our TikTok.

New floor laid after the works: screed levelled and covering finished flush with the neighbouring rooms
Flooring & screedLaying completed
Bathroom finished with a poured microcement floor, no visible joints
Poured flooringMicrocement, no joints
Tiled walk-in shower, waterproofing fitted underneath the covering
Bathroom tilingWalk-in shower
Floor and skirting renewed in a living room after the works
Interior flooringLiving room
New floor and refitted skirting in an entrance hall
Interior flooringHall & circulation
Floor and worktop renewed in an open-plan kitchen after renovation
Interior flooringOpen-plan kitchen

Watch our projects on video ↗

06 · Prices

Indicative prices
on the Belgian market

The ranges the market charges in 2026, published as they stand. Your quote may fall below or above them — it will be calculated, not estimated.

Tiling — essential
40 € – 70 € / m²
Tiling — comfort to premium
70 € – 220 € / m²
Parquet & laminate
20 € – 220 € / m²
Screed & levelling only
15 € – 65 € / m²
Poured flooring (resin, microcement)
70 € – 220 € / m²
Removal & disposal of old flooring
10 € – 25 € / m²
Skirting & thresholds
8 € – 18 € / linear metre

Indicative Belgian market ranges for 2026 — not an Alpha Services price list. Amounts excl. VAT. Fixed quote confirmed before work begins.

07 · Terrain

Renovating in Uccle:
what changes

Nineteen municipalities, each running its own planning department — and plenty of co-ownership, where the managing agent has a say before the first hammer falls.

Access to a Uccle home is agreed with whoever lives there before any trade arrives, covering which door is used and where the street outside is kept clear for a vehicle. Neighbours on that same street are told what to expect before work begins.

The 19 municipalities we cover

City of Brussels Anderlecht Auderghem Berchem-Sainte-Agathe Etterbeek Evere Forest Ganshoren Ixelles Jette Koekelberg Molenbeek-Saint-Jean Saint-Gilles Saint-Josse-ten-Noode Schaerbeek Uccle Watermael-Boitsfort Woluwe-Saint-Lambert Woluwe-Saint-Pierre
Drogenbos · Grimbergen · Linkebeek · Machelen · Overijse · Tervuren · Vilvoorde · Zaventem
07.1 · Co-ownership

Managing agent and general meeting, not one without the other

Most of Brussels' housing stock is co-owned: the managing agent (syndic) carries out decisions, but the general meeting makes them. Routine maintenance is voted by simple majority. Any change to the façade or shared areas needs a two-thirds majority; work touching the structure or ownership rights needs four-fifths. We prepare the technical file — quote, specification, sometimes a stability note — in the form your managing agent can put to a vote.

07.2 · Planning permits

Permit, listed buildings and what happens if it's refused

The rule is simple: a planning permit (permis d'urbanisme) is required, with a limited list of exceptions — interior work that doesn't affect stability, the layout of the housing units, or its designated use, like-for-like window replacement, an extension under 100 m² removed without rebuilding, solar panels not visible from the street. A listed building, or one on the heritage inventory — common in Brussels' older housing stock — is handled by the regional planning delegate instead of the municipality, with a 75-day decision period, or 160 days if a public inquiry is required. If refused, the applicant has 30 days to appeal to the regional government, then 60 days to the Council of State.

07.3 · EPB certificate

EPB certificate, EPB adviser and the permit file

An EPB energy certificate is mandatory whenever a home is sold or let, and stays valid for ten years. For new-build, work treated as new-build, or a heavy renovation, a certified EPB adviser is mandatory: they prepare the EPB proposal, which forms part of the planning permit file. With an architect, the architect handles EPB follow-up directly; without one, Homegrade or your municipality's planning department can help.

07.4 · Grants

RENOLUTION grants: where things actually stand

As of 24.07.2026, no RENOLUTION grant application is being accepted for a final invoice dated 2025 or 2026, and the Region has not published any decision on reopening the scheme — check be.brussels before any quote. The ECORENO loan from the Housing Fund remains a concrete alternative in the meantime, at 2.5% to 3.5% interest, for insulation, ventilation, heating, solar panels or a heat pump. A renovation obligation is due to start on 1 July 2028 for all Brussels owners — none of it applies today, and we'll flag it when it does.

08 · Questions

Your questions
before you sign

What comes up most at a first visit.

Why does the screed have to dry before the flooring goes down?
Because tile or parquet laid on a screed that is still damp comes loose or warps within months. Drying time depends on the thickness and type of screed: we check it before we lay, we do not guess.
How soon can you come out to Uccle?
We usually book the site visit within 24 to 48 working hours. The actual laying date depends on how long the subfloor takes to dry and the current schedule: it is in the quote, we do not promise a date the drying time will not allow.
Does tile or parquet over underfloor heating need special care?
Yes, and it differs by covering. Tile needs regular expansion joints, parquet needs wood suited to the system and a gradual warm-up after laying. We match the laying method to the heating system in place.
What if my existing floor is not flat?
Nothing gets laid straight on top of it. We check flatness with a 2-metre straightedge, and if it is out of tolerance, a levelling compound brings the subfloor back to level before tile, parquet or poured flooring goes down.
Will people living nearby know what is happening before work starts in Uccle?
Yes. Before the crew arrives, whoever shares the street is told what the work will involve, where deliveries are set down and where the vehicle will stand, so nothing about it comes as a surprise.
What happens if old wiring or pipework turns up once the floor or tiling is opened?
It is assessed on the spot and set out in a written addendum with its cost, separate from the original quote, and only carried out once you have reviewed and approved it.
09 · Contact

A PROJECT
IN UCCLE?
LET'S TALK.

Describe the job in three fields. We'll come back to you with a visit slot — free, no obligation, and without six follow-up calls.

Request a visit

3 fields · 20 seconds

Prefer to call?
0485 44 55 12
Here we go

WhatsApp opens with your message already written — all you need to do is press send. If nothing opens, call us on 0485 44 55 12.

Also working near Uccle

Service area: Uccle 1180, Région de Bruxelles-Capitale

Our other services in Uccle