Waterproofing and drainage
A waterproof membrane under the tiles, a fall towards the floor gully, and connections tested before anything is closed up: that is what stops a badly finished shower from staining the ceiling of the flat below.
In Brasschaat, each completed bathroom stage is checked against the written scope before the next trade begins its work.
Real site · Bathroom renovated start to finish
No contractor publishes their prices in Brasschaat. We do. Pick your project and you get a realistic figure, without leaving your number.
Estimated budget — excl. VAT
· · · tear off and send us this estimate · · ·
Refine with 3 photosIndicative Belgian market ranges for 2026 — this is not our price list. Your exact price is confirmed in writing after the free site visit, and it doesn't change after that. The 6% rate applies to homes occupied for more than 10 years, used mainly as a private residence, with materials invoiced by the contractor.
One point of contact, one schedule, one invoice. We do not let waterproofing, tiling and electrics be handled by three crews that never talk to each other.
The written scope sets out the bathroom work and listed materials for the Brasschaat address before work starts. If opening a surface reveals a finding outside that scope, it is described and priced in a written addendum for the client to approve. Once agreed, trades are sequenced so completed work is checked before the following task begins. This keeps decisions, materials and handovers visible throughout the renovation.
A waterproof membrane under the tiles, a fall towards the floor gully, and connections tested before anything is closed up: that is what stops a badly finished shower from staining the ceiling of the flat below.
A curbless walk-in shower needs a fall and a drain that fit within the depth of the floor. We check the existing screed at the survey, and tell you plainly if the slab means a small upstand rather than a perfectly flat floor.
A bathroom without mechanical extraction stays damp long after the shower is off, and mould returns on new tiling as readily as on old. We fit an extractor sized to the room, ducted to an existing outlet or a new one built for the job.
Sockets, lighting and electric heating follow the safety zones around the shower and the bath, set out in Belgium’s AREI/RGIE electrical code — not a standard socket fitted within splash range because it was easier.
Moving the soil stack changes where the shower or toilet can sit, but stays impossible when it serves several flats through a shared duct or runs through a load-bearing slab. We check this before drawing a layout that cannot actually be built.
Shower, bath, toilet, vanity unit and taps fitted and connected, finishing joints included. Cleaning the site is part of handover, not a line added on afterwards.
The price is fixed at step 3. After that, it does not move without your signature.
A call, or a few photos of the current bathroom over WhatsApp. We tell you straight away whether your project fits what we do — and if it does not, we say that too.
0485 44 55 12A site manager visits your home in Brasschaat, checks for damp, the thickness of the screed, and where the existing drain sits — that is what tells us whether a curbless walk-in shower is possible without breaking into the slab.
Within 24–48 working hours · freeFirm price, day-by-day schedule, payment terms. This document is the contract: no extra is charged without your written approval first.
The price is fixed hereA photo update every week. At the end, we jointly check the waterproofing, the ventilation and the finishes, with handover photos and the certificates Belgian law requires.
10-year structural guaranteeThe first complaint levelled at contractors is the line item nobody saw coming. Here is what we rule out.
Our own projects, not stock photos. The full video follow-along is on our TikTok.






The ranges the market charges in 2026, published as they stand. Your quote may fall below or above them — it will be calculated, not estimated.
Indicative Belgian market ranges for 2026 — not an Alpha Services price list. Amounts excl. VAT. Fixed quote confirmed before work begins.
Five provinces, one Flemish planning permit system (omgevingsvergunning) — but rules that have already shifted twice since early 2026.
When the crew leaves the Brasschaat address, access points are secured and the working area is left orderly. Keys and access details are kept under the project lead’s control, then used only when authorised work resumes.
The 5 provinces we cover
Since 1 March 2026, most interior work is exempt from Flanders' single environmental and building permit (omgevingsvergunning) and from any notification requirement, provided the building's volume doesn't change and its energy performance doesn't worsen. Some municipalities keep a local permit requirement, but only for a limited list set by the Flemish government. Where a permit is still needed, expect 60 days under the simplified procedure or 105 to 120 days under the standard one, with a possible 60-day extension.
Since 2023, anyone buying a home with an EPC label of E or F must renovate it to at least label D within a legal deadline — 5 to 6 years depending on the purchase date; check the exact cut-off on energiesparen.be. Missing the label risks a fine of €500 to €5,000, repeatable every year until the label is reached. This is already in force in Flanders, while Brussels and Wallonia won't introduce a comparable obligation until 2028.
Since 1 March 2026, the two highest income brackets can no longer claim Mijn VerbouwPremie for most works — only for a heat pump or a thermodynamic boiler, and at a reduced amount: an air-to-water heat pump down from €2,250 to €1,500, a thermodynamic boiler down from €900 to €450. Brackets 3 and 4 keep the previous amounts. Anyone who applied before 1 March 2026 stays under the old conditions.
The EPC-labelpremie has been scrapped for every income bracket, and its transition window — applications until 30 June 2026 for an EPC started before the end of 2025 — is now closed. Only households that activated their EPC through Fluvius before 1 January 2025 remain exempt. Don't count on this grant in a quote drawn up today.
What comes up at almost every first visit.
Describe the job in three fields. We'll come back to you with a visit slot — free, no obligation, and without six follow-up calls.
WhatsApp opens with your message already written — all you need to do is press send. If nothing opens, call us on 0485 44 55 12.
Service area: Brasschaat 2930, Antwerpen