Strip-out & clearance
The old kitchen removed, the rest of the home protected, rubble and old appliances cleared before anything new is connected.
In Mons, materials enter the home in a planned sequence, so completed preparation determines which trade follows and prevents avoidable rehandling.
Real site · Kitchen renovation
No contractor in Mons publishes their prices. We do. Three choices, and you leave with a ballpark figure, without leaving your number.
Estimated budget — excl. VAT
· · · tear off and send us this estimate · · ·
Refine with 3 photosIndicative Belgian market ranges for 2026 — this is not our price list. Your exact price is confirmed in writing after the free site visit, and it doesn't change after that. The 6% rate applies to homes occupied for more than 10 years, used mainly as a private residence, with materials invoiced by the contractor.
One point of contact for plumbing, wiring, tiling and fitting the units. We do not run a chain of subcontractors above your project.
Each trade takes over from the previous one with the relevant preparation complete, so work is not repeatedly opened, measured or corrected. In Mons, kitchen renovation begins with a visit that maps the requested work and the route materials will take through the home. The written quote then records the agreed scope before work starts, while the sequence keeps decisions visible as the installation progresses.
The old kitchen removed, the rest of the home protected, rubble and old appliances cleared before anything new is connected.
Moving the water inlet or the drain to match your new layout: possible in most cases, unless the distance to the soil stack forces a rethink of the layout.
A separate line for the oven and hob, a consumer unit sized for it, wired to AREI/RGIE code: our electricians are on our payroll, not passing subcontractors.
Working out where the hood actually vents, through the wall or the roof depending on the layout, with ducting sized to actually clear the air, not just spin.
Taking down a non-load-bearing wall, or fitting a steel beam when the span needs it: a structural check before pricing, never after demolition.
Screed, tiling, paint, worktop cut for the sink and hob, units fitted: in that order, so the tiles are never laid twice.
The price is fixed at step 3. After that, it does not move without your signature.
A call, or photos over WhatsApp: current layout, position of the sink, the consumer unit and the hood. We tell you straight away if the project fits what we do, and if it does not, we tell you that too.
0485 44 55 12A site manager comes to Mons, checks the water supply and drain, the power available at the consumer unit and where the hood can actually vent, before anything is priced.
Within 24 – 48 working hours · freeFirm price, schedule, payment terms. This document is the contract: no extra connection and no unforeseen plastering is billed without your written agreement.
The price is fixed hereA photo report every week. At the end, we check the finishes together, the sealing around the sink and hob, and the certificates Belgian law requires.
10-year structural guaranteeThe first complaint made about contractors is the line nobody saw coming. Here is what we rule out.
Our own projects, not stock photos. The full video follow-along is on our TikTok.






The ranges the market charges in 2026, published as they stand. Your quote may fall below or above them — it will be calculated, not estimated.
Indicative Belgian market ranges for 2026 — not an Alpha Services price list. Amounts excl. VAT. Fixed quote confirmed before work begins.
Five provinces under one planning code (the CoDT) — but grants and deadlines that run on their own calendar, not Brussels' or Flanders'.
Before work begins in Mons, any existing installation affected by the renovation is recorded in the visit notes, including its visible position and connection points. That record guides protection, removal and reconnection decisions before a trade touches it.
The 5 provinces we cover
The municipal council (collège communal) issues most permits, with an official timeline of 30 to 115 days depending on the procedure. Since 1 May 2025, a wider list of work is exempt: openings in a flat roof, bike shelters, covered parking for active mobility up to 60 m², HoReCa terraces up to 100 m², solar panels, heat pumps. Watch out for ground-mounted solar panels: the unlimited-surface exemption only applies in an economic activity zone — in a residential zone, a permit is still required.
Against a refusal, the applicant, the municipal council or the regional planning delegate have 30 days to appeal to the Walloon government. A third party — a neighbour, say — has no access to that administrative route and must go straight to the Council of State, within the standard 60-day period.
As of 24.07.2026, Prime Habitation is still accepting applications, final invoice included, up to and including 30 September 2026 — check energie.wallonie.be before any quote that would run past that date. An energy audit by a certified auditor is mandatory before work starts, except for roofing. Separately, the SWCS's Rénopack finances €1,000 to €60,000 at 0% interest, for a project capped at €62,500, repayable before the borrower's 86th birthday.
Nothing applies today: from 2028, anyone buying a home labelled E, F or G will have to reach at least label D within 5 years of the purchase deed, then C by 2031, B by 2036, A by 2041. Unlike Brussels, this obligation will be triggered by the purchase itself, not by a single calendar for every owner. We don't apply it to a project signed in 2026 — but we do factor it into a quote for a home that's about to change hands.
What comes up at every first kitchen visit.
Describe the job in three fields. We'll come back to you with a visit slot — free, no obligation, and without six follow-up calls.
WhatsApp opens with your message already written — all you need to do is press send. If nothing opens, call us on 0485 44 55 12.
Service area: Mons 7000, Hainaut